Investment Project

Foreign Economic and Technical Cooperation of Huzhou

Development Zone

Hangzhou Economic and Technological Development Zone

s Xiaoshan Economic and Technological Development Zone

Infrastructure

Installed capacity of 3*200 mw & transmission system

Installed capacity of 2*1 mkw & transmission system

Installed capacity of 2*200000 kw & transmission system

Installed capacity of 160000 kw, daily storage capacity of 1.1 million kwh; yearly generated energy of 367 million kwh

Installed capacity of 80000 kw

Manufacturing Industry

Introduction of key equipment & technique for production of 10000 CD1/MD1 motor pulleys 50% of which is for export

Utilizing foreign fund for expanded production of horizontal & vertical hydraulic jacks, with a yearly output of 160000; 80% of which is for export

Yearly output of 400 single-beam hoists & 200 double-beam hoists

Escalators, elevators & the components of chain transmission

Yearly output of 13000 engineering gear boxes & gear boxes for engineering machinery

Agriculture

A yearly output of 10000 tons

An enclosing area of 18000mu

Cableway, recreation paplace & scenic spots, etc

2000 tons of series food of hickory nut

Development of 20000 mu of outer marsh; a yearly output of 18000 tons of aquatic products

Service

2 additional speed liners with 200 seats and renovation of tourism equipment

The palace, located in Zhejiang National Tourist Holiday Resort, 70000 sq. m of planned land, its bulk rate of 0.2, for establishing high-tech recreation projects

The city's yearly reception capability of 2 million of tourists

A single-wire circulation cableway with 6-seat cars

Comprehensive development of the spot

REAL ESTATE

Building the center in the downtown, to provide a coordinated service for freign firms & joint ventures in terms of administration, business & living

The comprehensive building, located in the downtown area, occuping 10.5' mu, for the development of commerce, recreation & office, etc

Waiting room, restaurant, recreation center, shopping center & lodgings

The 3-star hotel occuping 32 mu of land

The raod length of 1.2 km; construction of dwelling buildings & shopping centers

Go chinaypages
Go Fair Online


Question or commend? Please send to: Webmaster
Copyright 1996,1997 Fair Online©, ALL RIGHTS RESERVED.
Designed by Webworm
Support by chinaypages©