Water and Electricity Systems

There is a sound water and electricity system in Wenzhou, which can provide 33,000 tons of water daily. Besides, the Zeya reservoir and the
Shanxi water conservancy project have now started building.

The electricity system is connected with that in East China. There are three 220,000-volt transformer substations in Wenzhou and a 500,000-volt transmission and transformation station is now under construction.

The first-phase project of the Wenzhou Electricity Plant with an installed capacity of 250,000 kilowatt has already been put into use. Its second-phase with a 600,000-kilowatt installed capacity and the 300,000-kilowatt Diaofeng project has started building.